| The Theodoriana power plant was completed in 2003.
Voith Hydro supplied two horizontal Francis turbines (2.6 MW and 1.3 MW), two synchronous generators (3.0 MVA and 1.5 MVA), three butterfly valves, and installed the automation system including governor oil units. |